RAK112_ENG / © Ensto 2019
Ø115 (x4)
250
395
450
600
Ø15
Figure 4
•
Place the adapter element on the foundation and
tighten the captive screws, 3 pcs.
•
Remove the upper nuts and upper pair of washers
from the adapter element. (Ensure there is one poly-
amide washer on each side of the mounting box.)
•
Pull the supply cable and possible data cable through
the hole in the center of adapter.
Figure 5
•
Place the mounting box on the adapter element.
•
Bolt the mounting box in place using the washers and
nuts you removed from the adapter element. (Ensure
there is one polyamide washer on each side of the
mounting box.)
•
Hint: to make it easier to certain that the mounting
box is levelled, first flip it upside down and position
the nuts under it so that it becomes levelled and then
flip it over again and tighten the upper nuts and wash
-
ers.
•
EVTL32.00:
Pull electrical cables through the ground
mounting box cable gland(s) approx. 400 mm meas-
ured from the upper end of the mounting box.
EVTL34.00
: Pull electrical cables through the ground
mounting box cable gland(s) and further through the
mounting box cable hole approx. 400 mm measured
from the upper end of the mounting box.
•
Tighten the cable gland. Close the unused cable en-
tries with cable gland plugs.
Figure 6
•
Open the maintenance door.
•
Remove the nuts and washers from the ground
mounting box.
•
Lift the EVF on the mounting box and pull the
electrical cables through the cable hole(s).
•
Bolt the EVF in place using the washers and nuts
you removed from the ground mounting box.
•
EVTL32.00:
Remove the supply cable sheath at
the length of max. 200 mm.
EVTL34.00
: Remove the supply cable sheath be-
ginning from the cable gland exit.
•
Cut the supply cable conductors to different
lengths. Cut the ground conductor longest, so
that if a fault occurs it is the last one that comes
loose.
•
Strip the supply cable conductors 25 mm.
•
Connect the supply cable wires to the supply ter-
minal blocks
.
•
Ensure that the PE is connected to the EVF.
•
Switch on F0, F1, F2 (if present) and QF1.
•
Close the maintenance door.
Bolt the EVF in place