background image

25

RAK112_ENG / © Ensto 2019

5.8 EVF300 mounting on concrete foundation

Items needed:

 

Mounting box EVTL35.00 

 

 

1 pcs

 

 

Adapter for concrete foundation EVTL37.00   

1 pcs

  Concrete 

foundation 

   1 

pcs 

  
This example describes installation procedure using concrete foundation, product code SJR-08, supplied by 

Sähkö-Jokinen Oy. 

I

f you want to use a foundation manufactured by another supplier, make sure that the foundation is compatible 

with the adapter.

• 

Dig a pit for the concrete foundation. The pit floor should be trampled and horizontal. 

• 

Install the foundation, cable pipes (supply and output chaining) and, if necessary, the cable pipe for the 

data cable into the ground. The pit floor should be trampled and horizontal. 

• 

Fill the pit with gravel. Trample the filling around the foundation to ensure stability.

800

450

Ground

Gravel

Adapter 

EVTL37.00 

Concrete 

foundation

Cable protection pipe Ø110

Summary of Contents for Ensto Pro Series

Page 1: ...RAK112_ENG 21 5 2019 Ensto 2019 ENG Ensto Pro EVF100 EVF200 EVF300 Installation instructions Operation instructions...

Page 2: ...unting on Unimi concrete foundation 18 5 6 EVF100 EVF200 wall mounting 20 5 7 EVF300 mounting on concrete casting at site 22 5 8 EVF300 mounting on concrete foundation 25 6 Supply Connections 27 7 Com...

Page 3: ...ll ap plicable codes and safety standards Ensto Pro 1 EVF100 EVF200 EVF300 Ensto Pro EVF is a solution for charging one or two electric vehicles It is engineered especially for fast AC charging but th...

Page 4: ...ssories Please order needed accessories based on mounting method EVF300 Installation method and site Accessories Ground mounting on concrete at site EVTL35 00 Ground mounting box Anchor bolts from a l...

Page 5: ...round mounting on ground mounting frame EVTL28 00 Ground mounting frame Ground mounting on concrete foundation EVTL36 00 Adapter Concrete foundation product code SJR 08 from S hk Jokinen Oy https www...

Page 6: ...und mounting box with cable entry from bottom Ground mounting box for EVF100 EVF200 EVTL34 00 EVTL34 00 is a ground mounting box with cable entry from top 182 M8 576 415 46 63 91 110 182 1 4 80 133 12...

Page 7: ...oncrete foundation adapter is designed to be used with a concrete foundation product code SJR 08 supplied by S hk Jokinen Oy Please order the foundation from https www sahkojokinen fi en If you want t...

Page 8: ...Wall Installation kit for EVF100 EVF200 EVTL31 00 EVTL31 00 is a wall installation kit including installation box and rail 360 320 90 100 366 576 105 105 269 330 100 80 45 1261 5 80 50 580 580 51 5 13...

Page 9: ...ENG Ensto 2019 Mounting box for EVF300 EVTL35 00 EVTL35 00 is a ground mounting box with cable entry from bottom to the main board 38 124 80 39 3 574 415 110 80 110 374 96 4x 14 14 415 304 Cable gland...

Page 10: ...e used with S hk Jokinen SJR 08 foundation Please order the foundation from https www sahkojokinen fi en If you want to use a foundation from another manufacturer make sure that the foundation is comp...

Page 11: ...age around the charging station Remove the film protecting the metal parts only after the installation is finished Note When selecting the installation location take into consideration the minimum spa...

Page 12: ...trampled and horizontal Put cable and possible drain pipes in place Fill the pit with concrete Let the concrete solidify make sure the surface stays solid and level during the process Installation ste...

Page 13: ...and plugs 7 Open the maintenance door 8 Remove the nuts and washers from the ground mounting box 9 Lift the EVF on the ground mounting box and pull the electrical cables through the cable hole 10 Bolt...

Page 14: ...mounting box is horizontal 4 EVTL32 00 Pull electrical cables through the ground mounting box cable gland s approx 400 mm measured from the upper end of the mounting box EVTL34 00 Pull electrical cabl...

Page 15: ..._ENG Ensto 2019 80 EVTL34 00 46 EVTL32 00 25 400 500 415 min R900 800 110 M12 Threaded bar Ground level Ground mounting frame EVTL28 00 Concrete Ground mounting box EVTL32 00 or EVTL34 00 Cable protec...

Page 16: ...and place the assembly on the concrete foundation 3 Tighten the assembly in place using the screws on the concrete foundation 4 EVTL32 00 Pull electrical cables through the ground mounting box cable g...

Page 17: ...17 RAK112_ENG Ensto 2019 800 450 80 EVTL34 00 46 EVTL32 00 Adapter EVTL36 00 Concrete foundation Gravel Cable protection pipe 110...

Page 18: ...aterials when setting the level Cover the unused conduit openings with plugs ac companying the foundation Lift the foundation into the installation pit the attach ment bar embedded in the foundation c...

Page 19: ...ed from the upper end of the mounting box EVTL34 00 Pull electrical cables through the ground mounting box cable gland s and further through the mounting box cable hole approx 400 mm measured from the...

Page 20: ...hers from the ground mounting box 11 Lift the EVF on the mounting box and pull the supply cable conductors through the cable hole 12 Bolt the EVF in place using the washers and nuts you removed from t...

Page 21: ...the wall bracket with adhesive tape Secure the EVF with screws Installation rail Install to wall with 6 pcs screws bolts 16 Mounting box Remove the cable sheath beginning from the cable gland exit Sup...

Page 22: ...te casting at site Items needed Ground mounting box EVTL35 00 1 pcs Anchor bolts M12 8 pcs Washers Nuts Make sure that the materials used for the concrete foundation and the installation procedures fo...

Page 23: ...ing box cable gland s approx 450 mm measured from the upper surface of the mounting box 7 Tighten the cable gland Close the unused cable entries with cable gland plugs 43 M12 150 64 86 Washer upper su...

Page 24: ...using intervening connection cables The intervening con nection cables are pre connected to the distribution cabinet power connectors 17 Pull the intervening connection cables first down through the m...

Page 25: ...on manufactured by another supplier make sure that the foundation is compatible with the adapter Dig a pit for the concrete foundation The pit floor should be trampled and horizontal Install the found...

Page 26: ...power connectors 12 Ensure strain relief to the cable by fastening the cable with e g MUPRO EuroQuick Select a suitable strain relief according to the cable diameter 13 Connect the supply to the charg...

Page 27: ...dimensioning must comply with national regulations System dimensioning must be done by a qualified electrical designer EVF200 Possible supply connections Use separate supply cables for each charging...

Page 28: ...plan F0 63A L1 L2 L3 Q1 Switch 80A L1 L2 L3 L1 L2 L3 L max 50mm2 Cu Al N max 50mm2 Cu Al PE max 50mm2 Cu Al L max 50mm2 Cu N max 50mm2 Cu L1 L1 L1 L2 L2 L2 L3 L3 L3 N N PE PEN PEN L3 L2 L1 N PE L3 L2...

Page 29: ...make sure that the basic function ality is working before establishing communication External communication can be implemented via 3G 4G optional alternatives Ethernet Wifi 7 1 Connecting charging sta...

Page 30: ...You must have an RFID tag which has a permission to access the charging point Start Charging with RFID When the charging point is free and the indicator light shows green you can start a charging eve...

Page 31: ...Cu 2 5 50 mm according to supply current and local regulations Tightening torque Nm 4 Nm 2 5 4 mm 12 Nm 6 50 mm Design and Mechanics EVF100 EVF200 EVF300 Material Painted aluminum and stainless steel...

Page 32: ...mestic socket Default Charging status indication 3 color LED Green Available Blue Charging Red Malfunction Simultaneous users 1 user 2 users 2 users User access and control Standalone mode default Fre...

Page 33: ...o 2019 10 Dimension Drawings EVF100 Ensto Pro with one charging point The charging point is placed on the left side seen from the maintenance door Note Domestic socket is optional 176 572 576 1375 132...

Page 34: ...34 RAK112_ENG Ensto 2019 EVF200 Ensto Pro with two charging points Note Domestic sockets are optional 176 575 579 180 1375 1329 46 180 110 490 90 507mm...

Page 35: ...wo charging points and a distribution cabinet Note Domestic sockets are optional 9 0 9 0 80 1261 1409 1329 80 572 574 364 978 574 276 5 374 327 5 701 5 Distribution cabinet depth 160 mm Mounting plate...

Page 36: ...rical installation Charging point s power supply capacity meets electrical planning cable size MCB Review local electrical design plan Gently push the charging point with a hand to create vibration to...

Page 37: ...B Gently push the controller to create vibration to ensure no bad contact connection exist on wire or PCB Create fail and charge with RFID tag to check all the LED states color green blue red and RFID...

Page 38: ...g current Protector V1 P1 Energy Meter L1 L1 L2 L2 L3 L3 18 17 16 15 13 N Lock Magnet 14 13 L1 L2 L3 F1 MCB L1 L2 L3 L1 L1 L2 L2 L3 L3 N N RCCB QF1 M1 RCCB Motor 14 11 12 L N I F0 FUSE B6 2 1 2T1 1L1...

Page 39: ...01 1 XST1100 1 XBU6000 XBU10201 8 1 XBU10200 8 1 XBU1100 8 1 4 1 XST9000 1 XBU03000 OUT L3 A1 CHAGO WALLBOX Controller XBU8000 XBU8001 CT EX OUT 2 EX OUT 2 EX OUT 1 EX OUT 1 I2C Power I2C SDA I2C CLK...

Page 40: ...ntroller Charging cable is locked in Mode 3 socket outlet Issue Corrective action Unexpected fault has occurred while power is on Option 1 If equipped with Mode 3 lock release functionality turn off t...

Reviews: