background image

07

Warning

Ensure input DC voltage

 ≤ 

Max. input DC voltage .Over voltage may cause 

permanent damage to inverter or other losses, which will not be included 
in warranty! This chapter contains important safety and operating 
instructions. Read and keep this Operation Guide for future reference.

Note

Grounding the PV generator. Comply with the local requirements for 
grounding the PV modules and the PV generator. Samil Power recommends 
connecting the generator frame and other electrically conductive surfaces 
in a manner which ensures continuous conduction and ground these in 
order to have optimal protection of the system and personnel.

2.3  Explanation of Symbols

This section gives an explanation of all the symbols shown on the inverter and on the type label.

●Symbols on the Inverter

Symbol 

                                                Explanation

5

 min

Danger to life due to high voltages in the inverter!
There is residual voltage in the inverter. The inverter requires 
5 minutes to discharge. 

 Wait 5 minutes before user open the upper lid or the DC lid. 

● Symbols on the Type Label

Symbol 

                                                Explanation

CE mark.
The inverter complies with the requirements of the applicable 
CE guidelines.

● Important Safety Instructions

When using the product, please do remember the below information to avoid the fire, lightning or 
other personal injury:

Safety

Summary of Contents for Samil Power SolarLake 10000TL

Page 1: ...Distribuidor exclusivo en Argentina SolarLake PV Grid tied Inverter User Manual...

Page 2: ...IMENSION 11 4 TECHNICAL DATA 12 4 1 INPUT DC 12 4 2 OUTPUT AC 12 4 3 EFFICIENCY SAFETY AND PROTECTION 13 4 4 GENERAL DATA 13 5 INSTALLATION 14 5 1 PACKAGING 14 5 2 INSTALLATION PRECAUTION 15 5 3 PREPA...

Page 3: ...MMUNICATION INTERFACE 34 7 2 COMMUNICATION 34 8 TROUBLESHOOTING 35 8 1 TROUBLESHOOTING 35 8 2 ROUTINE MAINTENANCE 38 9 DECOMMISSIONING 39 9 1 DISMANTLING THE INVERTER 39 9 2 PACKAGING 39 9 3 STORAGE 3...

Page 4: ...p this manual where it will be accessible at all times Product label The product label provides basic information of the inverter which is attached to the right side of the inverter Pay special attent...

Page 5: ...Warning indicates a hazardous situation which if not avoided could result in death or serious injury Caution Caution indicates a hazardous situation which if not avoided could result in minor or mode...

Page 6: ...d personnel only The appliance is not to be used by children or persons with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision...

Page 7: ...tion and ground these in order to have optimal protection of the system and personnel 2 3 Explanation of Symbols This section gives an explanation of all the symbols shown on the inverter and on the t...

Page 8: ...s See Warranty for instructions on obtaining service Attempting to service the SolarLake Series inverter user self may result in a risk of electric shock or fire and will void user warranty To reduce...

Page 9: ...ax efficiency up to 98 EU efficiency up to 97 6 THD 3 Power factor adjustable arrange 0 9 DC switch optional Grounding facility Safety Reliability Transformerless design with software and hardware pro...

Page 10: ...s the use of a DC switch is recommended Between the PV modules and the power modules may be mandatory in some countries Customers can select Samil Power SolarLake series inverters according to applica...

Page 11: ...1000 1000 1000 A 16 B 16 A 16 B 16 A 20 B 20 A 20 B 20 2 2 2 2 2 2 2 2 320 800 380 800 380 800 430 800 200 250 200 250 200 250 200 250 4 2 Output AC 10000 12000 15000 17000 10000 12000 15000 17000 3...

Page 12: ...98 0 98 0 98 0 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 4 4 General Data Model Dimension W H D mm Weight kg Cooling concept Noise emission typica...

Page 13: ...tional RS485 RS232 Ethernet USB and CAN Optional 5 5 5 5 5 Installation 5 1 Packaging list Please Check the package list find out all these in the package The product on the list are for installation...

Page 14: ...ars after your purchase if the installation site does not meet the instructions described in this manual it is out of warranty The warranty is limited to the costs of repair and or replacement of the...

Page 15: ...rill holes in the wall with 8 driller according to the size of bracket Keep drilling vertical to the wall and don t shake when drilling to avoid damage to the wall It need repositioning and drilling h...

Page 16: ...optional for users User can select the lock according to your requirements See step 4 5 5 Connections of the PV power system PV String input connection SolarLake series inverters SolarLake 10000TL So...

Page 17: ...not apply for thin film panel Figure 9 Use multimeter to measure module array voltage and detect the polarity Note Check the PV and PV from the PV string combiner box correctly Make sure the PV and PV...

Page 18: ...not apply for thin film panel Figure 9 Use multimeter to measure module array voltage and detect the polarity Note Check the PV and PV from the PV string combiner box correctly Make sure the PV and PV...

Page 19: ...ut of the four screws at four corners of the cover get off the cover Step2 There are 5 white terminals which are PE N L3 T L2 S L1 R Put the 5 wire of AC cable through the house tunnel then put the wi...

Page 20: ...uld be less than 150m Below chart is cable length section area and wire loss Figure13 AC Cable Loss 5 6 Run the inverter Start inverter after checking all below steps a Make sure all the DC Switch and...

Page 21: ...ease refer to chapter 8 1 troubleshooting table Note If inverter shows Fault status please refer to Part 8 troubleshooting 6 Operation 6 1 Control and Display Panel Figure 14 Green LED Red LED LCD But...

Page 22: ...isolation resistor relays and other safety requirements It will also do self test to ensure inverter software and hardware are functional Inverter will go to FaultState or PermernentState if any error...

Page 23: ...at language is nothing to do with the county safety setting Users can use UP and DOWN buttons to select the language the press OK button to confirm the selection Step3 Country setting Following screen...

Page 24: ...19 String input connection setting Step 4 Step 5 Date and time setting Setting the date according to your local date and time Please use LEFT and RIGHT button to move curse the UP and DOWN button wil...

Page 25: ...er If the setting information does not meet requirements please press ESC button to reselect your setting See figure 21 Figure 21 Setting information checking Step 6 Step7 Enter standard screen Confir...

Page 26: ...day Day production this month Month production this year and last 20 year production User can change pages via press LEFT and RIGHT buttons Move selection on Event List press OK button user will get d...

Page 27: ...from qualified technical support 6 1 3 Autotest procedure Italy only Only country setting is Italy during commissioning Enter main menu then enter setting sub menu select AutoTest Ita to run an autom...

Page 28: ...in test is over the LCD will show the result and OK to start F_max and the inverter will reconnect automatically 7 Then press OK button to start grid R F_max test Alternatively press ESC button to exi...

Page 29: ...n to start grid T V_max test Alternatively press ESC button to exit from New Autotest If there is no button operation within 5 seconds the test will start automatically If the test has started key ope...

Page 30: ...wing AutoTest results from the inverter s LCD Enter Main Menu then enter Settings sub menu select AutoTest Ita and enter it then select Last Results press OK button the LCD will show the latest severa...

Page 31: ...ion port com1 com9 as shown in Figure 28 and Figure 29 Figure 28 Select inverter module Figure 29 Select communication port 30 Then click OK button Enel exe software automatically reads the inverter s...

Page 32: ...the backlight is on user will see the main screen If none key touching in 60 seconds the backlight will be off After that user touch any button the backlight will be on Note that If no operation in 60...

Page 33: ...inverters Figure 33 For communication cable one end is male connector the other end is female connector Figure 33 RS232 Communication Diagram One inverter can only be communicated with one PC at the s...

Page 34: ...entify and solve most problems that could occur with the SolarLake series inverters This section will help user narrow down the source of any problems user may encounter Please read the following trou...

Page 35: ...SUnderRating VGridTOverRating VGridTUnderRating FreGridOverRating DCIGridROverLimit FreGridUnderRating DCIGridSOverLimit DCIGridTOverLimit Pv1VoltOvrFault Pv2VoltOvrFault PvVoltLowFault PvVoltOvrFault...

Page 36: ...utoTestFail HWADFault_VGrid HWADFault_IGrid HWADFault_DCI HWADFault_GFCI NOT USED unrecoverHW_OCP_AC unrecoverBus_OVP_Fault unrecoverBoost1_OCP RChipFault AuxPower_Fault OverTempFault PLLFault BusVolt...

Page 37: ...ection Table 7 Table 8 Group IDinGroup Description Suggested operation and solution 0 1 2 3 4 5 6 8 7 9 10 LcdEmergencyStop Language Time Country Input ClearProd ClearEvent LCDBright ReFactorySet LCDl...

Page 38: ...he AC terminals via screw drivers Now inverters can be demounted in a safe way 9 2 Packaging If possible please pack the inverter with the original packaging If it is no longer available user can also...

Page 39: ...about SolarLake series inverter please call service support hotline 86 510 83593131 Please keep following information to better our service for user a Inverter s Model b Inverter s Serial No c Communi...