28
Make sure during commissioning the country is Italy, then inverter can do self-test automatically
follow above instructions.
Operate a new AutoTest procedure
1.Before performing the AutoTest, confirm the country setting is “Italy” and the inverter is running
in normal state.
2.On the display Main Menu find (Settings→ AutoTest Ita.) and press OK, then select “New
Autotest” , press OK , the LCD will be cleared, wait a few seconds, and you can see “(OK) to
start Grid R V_max” on the LCD.
3.Press OK button to start grid R V_max test, or press ESC button to exit from “New Autotest”. If
there is no button operation within 5 seconds, the test will start automatically. If the test has
started, key operation is invalid until test is over.
4.After grid R V_max test is over, the LCD will show the result and “(OK) to start V_min”, and
the inverter will reconnect automatically.
5.Then press OK button to start grid R V_min test. Alternatively press ESC button to exit from
“New Autotest”. If there is no button operation within 5 seconds, the test will start automatically. If
the test has started, key operation is invalid until test is over.
6.After grid R V_min test is over, the LCD will show the result and “(OK) to start F_max” , and
the inverter will reconnect automatically.
7.Then, press OK button to start grid R F_max test. Alternatively press ESC button to exit from
“New Autotest”. If there is no button operation within 5 seconds, the test will start automatically. If
the test has started, key operation is invalid untill this test is over.
8.After grid R F_max test is over, the LCD will show the result and “(OK) to start F_min” , and
the inverter will reconnect automatically.
9.Then, press OK button to start grid R F_min test. Alternatively press ESC button to exit from
“New Autotest”. If there is no button operation within 5 seconds, the test will start automatically. If
the test has started, key operation is invalid untill this test is over.
10.After grid R F_min test is over, the LCD will show the result and “(OK) to start Grid S V_max” ,
and the inverter will reconnect automatically.
11.Then, press OK button to start grid S V_max test. Alternatively press ESC button to exit
from “New Autotest”. If there is no button operation within 5 seconds, the test will start automatically. If
the test has started, key operation is invalid untill this test is over.
12.After grid S V_max test is over, the LCD will show the result and “(OK) to start V_min”,
and the inverter will reconnect automatically.
Operation