![Endress ESE 1308 DBG ES DUPLEX SILENT Operating Instructions Manual Download Page 34](http://html1.mh-extra.com/html/endress/ese-1308-dbg-es-duplex-silent/ese-1308-dbg-es-duplex-silent_operating-instructions-manual_2407078034.webp)
Operation
Setting up the generator
Version: May 2011
ESE 808 / 1308 / 1408 DBG ES DU PLEX SILENT
34
4.2 Setting up the generator
Proceed as follows to set up the generator.
The follow ing requirements must be fulfilled:
•
An even and firm underground outdoors
•
There are no inflammable materials at the place of work
•
There are no explosive materials at the place of work
CAUTION!
Leaking engine oil and petrol can contaminate the soil
and groundwater.
•
Prevent leaking of engine oil and petrol.
The generator is set up as follows:
1. Prepare the work site.
2. Transport the generator to the work site.
3. Attach the exhaust hose if necessary (a special
accessory see 3.3.2)
The generator is set up and ready for use.
4.3 Refuelling the generator
Proceed as follows to refuel the generator.
The follow ing requirements must be fulfilled:
•
Switched off generator (see 0)
•
The device must be cooled down.
•
Sufficient ventilation must be available.
•
Appliances switched off or disconnected
Requirements
Setting up the generator
Requirements