Prothermo NMT532
Installation
Hauser
23
12. Rotate the nuts clockwise until the top anchor's spring is
35 to 37 mm (1.38 to 1.46 in).
35 - 37
(1.38 - 1.46)
A0038513
15
Top anchor installation 2. Unit of measurement mm (in)
13. Cover the top anchor.
This completes the procedure for installing a top anchor.
Summary of Contents for Prothermo NMT532
Page 72: ...www addresses endress com...