
Commissioning
Proline t-mass A 150 HART
48
Hauser
10
Commissioning
10.1 Function check
Before commissioning the device, make sure that the post-installation and post-
connection checks have been performed.
• "Post-mounting check" checklist → 21
• "Post-connection check" checklist → 26
10.2 Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display
to the measured value display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 80.
10.3 Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Display/operat.
Setup
Main menu
0104-1
Language
English
Español
Français
Language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Language
English
Deutsch
0104-1
Anzeige/Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XX
XX
A0013996
Summary of Contents for Proline t-mass A 150
Page 133: ......
Page 134: ...www addresses endress com...