Proline Fieldcheck
Wiring
Hauser
25
4.
Loosen the fixing screw (6) of the cover of the connection compartment (7) and fold down the
cover.
5.
Connect Fieldcheck to the current output/power supply (8) and to the pulse output (9) if
available. The terminals can be disconnected for this.
"
Caution!
– The current output can only be tested for accuracy during the verification if it is connected
to the current input of Fieldcheck (1/2 terminal pair).
– If the pulse output of the flowmeter is activated, the 3/4 terminal pair must be connected
directly to the Fieldcheck frequency input (F). This also applies to the PFM operating mode
(pulse/frequency modulation).
a0001703
Fig. 18:
Wiring the terminals of Prowirl 72, 73 with Fieldcheck
6.
Fold up the plastic cover (10).
7.
Disconnect the signal cable connector from the amplifier socket (11).
8.
Plug the Simubox cable connector into the amplifier socket (11).
9.
Connect Fieldcheck to the service connector (12).
1 2
3 4
+
+
-
-
DC
SIM
SRV
I
F