Installation
Deltabar S FMD77, FMD78, PMD75 with FOUNDATION Fieldbus
30
Hauser
4.4
Post-installation check
After installing the device, carry out the following checks:
• Are all screws firmly tightened?
• Are the housing covers screwed down tight?
• Are all locking screws and vent valves firmly tightened?