CleanFit P CPA 472
3 Installation
Hauser
13
KCl electrode
1. Pull lifting tube fully into assembly (in
»Maintenance« position, see Fig. 3.7)
2. Turn stop bolt lock through 90° so that
plastic grooves are located above the
recesses.
3. Turn lifting tube clockwise until stop
bolt lock engages.
4. Remove splash protection cap
5. Now you can remove the lifting tube by
turning anticlockwise.
6. Slacken and remove tension sleeve.
7. Remove electrode tube from lifting tu-
be.
8. Insert electrode in electrode tube (
➀
),
screw it in and tighten with socket
spanner (WAF17) by ¼ turn (
➁
).
9. Insert electrode and electrode tube in
lifting tube.
10.Insert tension sleeve from bottom in lif-
ting tube (
➂
) and screw to electrode
tube (
➃
).
11.Screw lifting tube and electrode hand-
tight on assembly.
12.Insert measuring cable from top th-
rough protective tube and KCl hood.
13.Screw measuring cable on electrode
plug-in head and tighten hand-tight.
14.Insert electrolyte supply tube through
KCl hood and connect to electrode
electrolyte connection.
15.Place measuring cable and electrolyte
supply tube in splash protection cap
and place this assembly on protection
tube.
16.Release stop bolt lock: Remove stop
bolt lock and turn through 90°.
Remove electrode in the reverse se-
quence of operations.
Abb. 3.10: Installing the liquid KCl electrode in the
lifting tube
Abb. 3.11: Connections on CPS 41 electrode