– Page 11 –
Off-line Connection Verification
Conduct a continuity test of each and every connection using a multi-meter to ensure that all the sequences are correct
as per the connection schematic and above procedure.
If any of the sequence is found to be incorrect, iSaver DPFC will not work properly. It is mandatory to correct the
connections.