background image

26127-5-0111

Page 35

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

Installing Optional CIB3 Blower

1.  Loosen, but do not remove, four (4) hex-head screws located 

on the exterior, bottom of the appliance.

2.  Position the blower assembly at the rear of the appliance. The 

blower assembly has four (4) keyholes for attachment to the 

exterior, bottom of the appliance.

3.  Place the large diameter holes in the keyholes over and behind 

the four (4) hex-head screws that were loosened in Step 1. 

Push inward on the blower assembly to lock the keyholes into 

position behind the screws. Tighten four (4) hex-head screws to 

secure blower assembly to exterior, bottom of the appliance.

4.  Remove  wire  channel-left  from  appliance  by  removing  (2) 

 

10 x 1/2" screws on left side of the appliance. Note: Some 

units require a new wire channel. If Rheostat mounting holes 

are missing from part removed from unit, discard wire channel 

removed from unit and continue installation with appropriate 

wire channel shipped with blower. See Figure 40.

5.  Route  fan  control  wires  through  rectangular  notch  on  wire 

channel - left.

6.  Attach 1/4" push-on terminal from blue wire on the fan control 

to the AUTO (top) tab on the switch.

7.  Attach 1/4" push-on terminal from black wire to the OFF (middle) 

tab on the switch.

8.  Attach 1/4" push-on terminal from white wire on the fan control 

to the ON (bottom) tab on the switch.

9.  Insert AUTO/OFF/ON switch into rectangular notch on  wire 

channel - left.

10.  Install rheostat through hole in wire channel and align small 

tab with small hole.

11.  Use  an  11/16”  wrench  to  tighten  rheostat  nut  on  stationary 

Figure 40

portion of knob stem of the rheostat. Note: Nut is self-tapping 

and can be started at an angle.

12.  Push rheostat knob onto knob stem until fully seated.

13.  Bend the fan control tab, located on the left side of the back 

of the unit, inward toward the unit. See Figure 40. Be sure tab 

is bent at least 90 degrees to allow fan control bracket to slide 

into slot. 

14.  Attach  fan  control  with  bracket  onto  rear  cover  with  

two (2) 10 x 1/2" screws provided in hardware package.

15.  Route wires from fan control and ON/OFF/REMOTE switch 

within wire channel.

16.  Attach wire channel to channel divider with two (2) 10 x 1/2" 

screws from Step 4.  

17.  Installation of optional CIB3 blower is completed.

Fan Control

The fan control is a non-adjustable automatic type The fan control will 

require between 5 and 10 minutes of main burner operation before 

the fan control "closes" and activates the blower.  The blower will 

continue to run between 5 and 10 minutes after the main burner shuts 

off, before the fan control "opens" and deactivates the blower.

AUTO/OFF/ON SWITCH

BLOWER ASSEMBLY

FAN CONTROL

RHEOSTAT

KNOB

NUT

WIRE CHANNEL - LEFT

WIRE CHANNEL - LEFT

(VF) MODELS

(DV) MODELS

FAN CONTROL TAB

Summary of Contents for DVP30CA30BN-2

Page 1: ...DVP30CA30 B F M S W N 2 DVP30CA30 B F M S W P 2 Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not tr...

Page 2: ...Framing and Finishing 17 18 Horizontal Termination 18 Vertical Termination 19 20 Log Placement 21 Operating Guidelines 22 Lighting Instructions 23 Pilot Flame Characteristics 24 Main Burner Flame Cha...

Page 3: ...e is tempered glass If the glass is cracked or damaged in any way it should be replaced only with a complete glass frame assembly from Empire See parts list on Page 30 for ordering Do not use this fir...

Page 4: ...s Theodorantinescapedgascanadsorborabsorbontoorintowalls masonry and other materials and fabrics in a room That will take some of the odorant out of the gas reducing its odor intensity LP Gas may stra...

Page 5: ...visions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 3 SIGNAGE A metal or plastic identification plate shall be per manently mounted to the exterior of the building at a min...

Page 6: ...enced in such work familiar with all precautions required and has complied with all the requirements of the authority having jurisdiction The installation must conform with local codes or in the absen...

Page 7: ...6DVA E90B DVKVP Direct Vent Kit for Vertical Run 2 46DVA 48B 46DVA DC 46DVA F6 46DVA SC 46DVA FS 46DVA VCH Accessories TMV Millivolt Wall Thermostat Reed Switch FRBC Battery Operated Remote Control FR...

Page 8: ...near the gas inlet This should consist of a vertical length of pipe tee connected into the gas line that is capped on the bottom in which condensation and foreign particles may collect When using cop...

Page 9: ...ngle to Wall 4 101 6 mm Floor 0 0 mm Installation on Rugs and Tile This appliance must be installed on a flat solid continuous surface e g wood metal concrete This may be the floor or it may be raised...

Page 10: ...e restrictor plate must be used above 10 feet Maximum horizontal run from appliance outlet 12 feet 3 66 m Maximum vertical rise and horizontal run is a combined total of 25 feet 7 62 m Maximum elbows...

Page 11: ...e side and bottom Cutting the Hole Figure 7 After the appliance has been positioned in its permanent location the hole through the exterior wall of the house can be cut This hole needstobe10 highx10 w...

Page 12: ...de 2 Remove cast iron front and carefully set aside 3 Carefully remove glass door 4 Remove the log shelf by removing the 2 screws securing the log shelf to the wall 5 Loosen the upper 2 screws of both...

Page 13: ...ack down locking the air shutter in place Be sure that the air shutter is the same distance from the burner orifice on both sides of the air shutter for proper burner fit up 10 Carefully replace the b...

Page 14: ...ing Routes and Components Important It is always best to locate the appliance in such a way that minimizes the number of offsets and horizontal vent length Sinceitisveryimportantthattheventingsystemma...

Page 15: ...e center line of the regulator I Clearance to service regulator vent outlet 6 feet 1 83 m minimum J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other ap...

Page 16: ...hes The vent pipe is now locked together Continue adding components per the pre planned vent system configuration Be certain that each succeeding vent component is securely fitted and locked into the...

Page 17: ...hole previously cut Secure with nails or screws Continue the vent run through the firestops See Figure 19 Figure 19 Vertical runs of this system which pass through ceilings require the use of ONE 1 ce...

Page 18: ...ews provided Before attachment of the termination run a bead of silicone sealant rated above 250 F on its outside edge too so as to make a seal to that exterior wall NOTE Wood screws can and should be...

Page 19: ...e as follows 1 Check areas of the venting system which are exposed to the elements for corrosion These will appear as rust spots or streaks and in extreme cases holes These components should immediate...

Page 20: ...materials including insulation to the vent system are maintained Vertical Through the Roof Applications Your Gas Fireplace has been approved for a Vertical installations up to 25 feet of vent run b Tw...

Page 21: ...toe resting on the groove in the left front log 12 Place right twig onto right side pin on rear log with toe resting all the way to the right on the right front log 13 Align and place top of glass fr...

Page 22: ...g Pilot Operation 1 FollowtheSAFETYandLIGHTINGINSTRUCTIONSforstanding pilot controls found in this manual and on labels found attached to the appliance CAUTION During the initial purging and subsequen...

Page 23: ...which must be lighted by hand When lighting the pilot follow these instructions exactly B Before lighting smell all around the appliance area for gas Be sure to smell next to the floor because some g...

Page 24: ...thermopile just below the tip A slight yellow flame may occur where the pilot flame and main burner flame meet The incorrect pilot flame is not touching the thermocouple or thermopile This will cause...

Page 25: ...pointment theservicepersonshouldcleandust lint and any light accumulation from the logs and the firebox area An extra soft brush should be used on the logs as they are extremely fragile a vacuum clean...

Page 26: ...ess the black and green wires female push ons attach to the gas valve An additional green wire and the red wire which are stripped and bare will attach to the 750 millivolt wall thermostat accessory o...

Page 27: ...26127 5 0111 Page 27 Wiring Diagram Figure 34 WIRING continued...

Page 28: ...ce glass frame assembly on a non abrasive surface The exterior of the glass frame assembly should be facing the non abrasive surface 7 Insert a putty knife between glass and bottom corners on frame Ca...

Page 29: ...h the pilot lit and the ON OFF switch in the OFF position Replace the faulty thermopile if the reading is below the specified minimum With the pilot in the ON position disconnect the thermopile leads...

Page 30: ...URNER ASSEMBLY 19 P 253 ORIFICE ANGLED FITTING 20 24429 ORIFICE HOLDER BRACKET 21 R 7572 JAMB NUT 22 P 244 ORIFICE 33 LPG 22 P 185 ORIFICE 52 NAT 23 26561 AIR SHUTTER BRACKET 24 23939 FIREBOX BOTTOM 2...

Page 31: ...26127 5 0111 Page 31 PARTS VIEW 1 9 4 2 3 4 6 4 8 10 11 12 14 15 16 28 29 31 36 37 38 39 40 41 42 43 44 45 30 17 18 19 20 21 22 24 25 26 27 32 34 35 23 13 33 5 7 29 47 9 46...

Page 32: ...IGHT 8 R 9694 CASTING DOOR LEFT 9 24191 FIREBOX SUPPORT BRACKET 2 REQUIRED 11 R 9549 CASTING LEG B 12 R 9548 CASTING LEG A PORCELAIN BLACK 1 R 9570 TOP INSERT RIGHT 2 R 9569 TOP INSERT LEFT 3 R 9568 C...

Page 33: ...26127 5 0111 Page 33 1 2 8 3 4 5 6 7 9 9 10 10 10 10 12 11 11 12 CASTING PARTS VIEW...

Page 34: ...to casting before fully tightening bolts as shown in Figure 37 9 Replace cast iron or stone inlay inserts into casting top Note Be sure to remove side shelf supports prior to removing cast iron top t...

Page 35: ...1 4 push on terminal from white wire on the fan control to the ON bottom tab on the switch 9 Insert AUTO OFF ON switch into rectangular notch on wire channel left 10 Install rheostat through hole in...

Page 36: ...y grounded three prong receptacle Do not cut or remove the grounding prong from this plug For an ungrounded receptacle an adapter which has two prongs and a wire for grounding can be purchased plugged...

Page 37: ...reet Hartford CT 06114 Phone 860 722 2433 Toll Free 800 243 9360 Fax 860 293 0479 Toll Free Fax 800 274 2004 Websites www fwwebb com www victormfg com Parts Heater Hearth and Grills MASTER PARTS DISTR...

Page 38: ...26127 5 0111 Page 38 APPLIANCE SERVICE HISTORY Date Dealer Name Service Technician Name Service Performed Notes...

Page 39: ...ng the front of the direct vent fireplace the minimum clearances to combustible construction material are the following Top of appliance ceiling 36 inches Heater Corners 45 angle to Wall 4 inches Rear...

Page 40: ...s Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question...

Reviews: