Emerson FB1100 Flow Computer Instruction Manual
D301752X012
August 2020
30
Installation
Figure 2-21: Connecting the Battery Pack
1
Left Battery Connector
2
Right Battery Connector
Restriction
The solar panel and lead acid battery combination cannot be used with ATEX/IECEx applications.
2.12
Installing the Optional Solar Panel
If you purchased the lead acid battery/solar panel kit for main power, you need to install the
supplied 6W solar panel.
If you purchased the lead acid battery with a solar regulator but you are supplying your own solar
panel, follow the manufacturer’s instructions for remote mounting.
DANGER
EXPLOSION HAZARD: Ensure the area in which you perform this operation is non-hazardous.
Performing this operation in a hazardous area could result in an explosion.
Solar panel installation involves:
Attaching mounting hardware to the solar panel (if not attached prior to shipment).
Mounting the solar panel in one of two ways:
Integral mount (solar panel attaches directly to the flow computer)
Remote mount (solar panel mounts to a pole)
Wiring power to the solar panel.
Setting the tilt angle of the panel for maximum solar exposure.
Summary of Contents for FB1100
Page 14: ...Emerson FB1100 Flow Computer Instruction Manual D301752X012 August 2020 10 Introduction ...
Page 48: ...Emerson FB1100 Flow Computer Instruction Manual D301752X012 August 2020 44 Installation ...
Page 87: ...Emerson FB1100 Flow Computer Instruction Manual D301752X012 August 2020 Index 83 ...