100-412-183 REV. 13
117
8.2.2.1
Stack Torque Values
For a 20 kHz System
Table 8.3
Stack Torque Values
Frequency
Torque
20 kHz
220 in·lb (24.85 N·m)
30 kHz
185 in·lb (21 N·m)
40 kHz
95 in·lb (10.73 N·m)
Table 8.4
Stack Reassembly for a 20 kHz System
Step
Action
1
Clean the mating surfaces of the converter, booster, and horn. Remove any
foreign material from the threaded holes.
2
Install the threaded stud into the top of the booster. Torque to 450 in·lb
(50.84 N·m). If the stud is dry, apply 1 or 2 drops of a light lubricating oil
before installing.
3
Install the threaded stud into the top of the horn. Torque to 450 in·lb
(50.84 N·m). If the stud is dry, apply 1 or 2 drops of a light lubricating oil
before installing.
4
Install a single Mylar plastic film washer (matching the size of the washer to
the stud) to each interface.
5
Assemble the converter to the booster and the booster to the horn.
6
Torque to 220 in·lb (24.85 N·m) at each interface.
Summary of Contents for DCX S
Page 4: ...iv 100 412 183 REV 13 ...
Page 22: ...12 100 412 183 REV 13 ...
Page 36: ...26 100 412 183 REV 13 ...
Page 47: ...100 412 183 REV 13 37 4 3 Declaration of Conformity Figure 4 1 Declaration of Conformity ...
Page 50: ...40 100 412 183 REV 13 ...
Page 54: ...44 100 412 183 REV 13 Figure 5 1 DCX S Power Supply Benchtop Dimensional Drawing ...
Page 86: ...76 100 412 183 REV 13 ...
Page 87: ...100 412 183 REV 13 77 Chapter 6 Converters and Boosters 6 1 Converters and Boosters 78 ...
Page 120: ...110 100 412 183 REV 13 ...
Page 137: ...100 412 183 REV 13 127 8 5 Circuit Diagram Figure 8 2 Interconnect Diagram Power Supply ...
Page 144: ...134 100 412 183 REV 13 ...
Page 145: ...100 412 183 REV 13 135 Appendix A Timing Diagrams A 1 Timing Diagrams 136 ...
Page 147: ...100 412 183 REV 13 137 Appendix B Signal Diagrams B 1 Signal Diagrams 138 ...
Page 154: ...144 100 412 183 REV 13 ...