2 • CH Breaker Gateway I&O Manual
026-1710 Rev 1 05-15-07
The Gateway should be mounted in an environment
with ambient temperature between -40°F and 150°F, with a
non-condensing relative humidity between 5% and 95%.
Gateway boards are not supplied with an enclosure but
come with a snap-track for easy installation. The insulation
sheet and I/O board must be removed from the track before
the track is mounted. The snap-track is mounted using the
0.1875” mounting slots.
Figure 2-2
shows this installation
procedure.
3
Power Wiring
3.1.
CH Breaker Gateway Power
Wiring
The Gateway requires 24VAC power from a Class 2
center-tapped
transformer.
CPC supplies several sizes of center-tapped transform-
ers for powering multiple 16AIs, 8ROs, and other RS485
peripheral boards of the E2, Einstein, and REFLECS sys-
tems.
Refer to your controller’s user manual for information
on how to use the center-tapped transformers listed in
Ta-
ble 3-1
to power multiple RS485 I/O devices for the US and
Canada.
Figure 3-1
shows how to connect the 56VA and 80VA
transformers to the Gateway power connector.
Figure 2-1
- Gateway Board Mounting Dimensions
Figure 2-2
- Snap-Track Installation
Input Voltage
24VAC, Class 2, 50/60Hz
Power
5VA
Table 3-1
- Gateway Power Requirements
Three-Board
Six-Board
P/N
640-0056
640-0080
Power Rating
56 VA
80 VA
Table 3-1
-US and Canada Power Ratings for CPC Transformers
Figure 3-1
- Pinout for the 56VA (640-0056) and 80VA (640-
0080) Transformers
Summary of Contents for CH Breaker Gateway
Page 1: ...026 1710 Rev 1 05 15 07 CH Breaker Gateway Installation and Operation Manual ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 22: ......