25
Anderson Greenwood
SerieS 9300 Pilot oPerated Safety relief ValVeS
InstallatIon and MaIntenance InstructIons
Set pressure adjustment
Vacuum set adjustment
test pilot
Vent
Vent
Positive pressure pilot
negative pressure pilot
test pilot
reseat pressure adjustment
reseat vacuum
adjustment on back side
dome pressure gauge
dome vacuum gauge
accumulator .25 ft
3
[.007 m
3
]
accumulator .25 ft
3
[.007 m
3
]
½” Pipe (min)
⅜” Pipe (min)
Supply pressure gauge
Supply vacuum gauge
Supply
pressure
Supply vacuum
Supply port (½” NPt)
Supply port (⅜” NPt)
fiGUre 14