Embraer ERJ-190 Series (GE CF34)
ATA 05
– ATA12
B1.1. and B2
AIRPLANE GENERAL
ISSUE 1, 24 Sep 2014
FOR TRAINING PURPOSES ONLY
Page:
112
MOORING THE AIRCRAFT
The procedures for mooring the aircraft are used when the weather
conditions are bad or unknown, and/or high wind speeds are expected.
For this procedure, tie down rings are installed in each primary brace strut of
the main landing gear. Ropes are then used to tie the aircraft to tie down
anchors installed in the floor.
The area where to moor the aircraft must be paved and level, with ground tie-
down anchors available.