BIOTOPUS II
- Operator manual
Page 18
Quick Start
The next step will be to load and confi gure the connected device(s):
CONNECTED DEVICES
First you’ll need to confi rm the connected probe(s) starting from the fi rst (pH1) and then
the second pH probe(pH2), the Redox Probe (REDX), the Conductivity Probe, the GSM
module, the RESCUE module.
The next step will be to calibrate the connected probe(s): please note that, only if the
probe(s) are connected to the system and correctly installed (see above, CONNECTED
DEVICES), the CONTROLLER will permit you to calibrate the probe(s).
If no probe(s) are installed, the MENU’ will be EMPTY.
CALIBRATE THE TEMPERATURE PROBE:
It should not be necessary at this step to calibrate the Temperature Probe.
CALIBRATE THE pH PROBE(s):
pH Probes require periodic calibration to maintain accuracy. Each probe is calibrated
through a simple process of placing it into a standard solution of known water quality
following the prompts on the display.
The pH calibration is done using two different buffer solutions. Standard buffer solution
choices are pH 4, and 7. Set up two cups: Elos Calibration Solution pH4 in the fi rst cup,
Summary of Contents for BIOTOPUS II
Page 2: ...BIOTOPUS II Operator manual Page 2...
Page 5: ...BIOTOPUS II Operator manual Page 5 Figure 1 1...
Page 6: ...BIOTOPUS II Operator manual Page 6...
Page 30: ...BIOTOPUS II Operator manual Page 30...
Page 31: ...BIOTOPUS II Operator manual Page 31 ADAVANCED OPERATION...
Page 46: ...BIOTOPUS II Operator manual Page 46 MISCELLANEOUS...