Platform Safety-hireach EEC-0145
V1.1
Platform Safety
CLEARANCE REQUIREMENTS
table or the clearances as dictated by applicable
governmental regulations.
Platform Installation
NOTE: THIS DOES NOT APPLY TO V60 MODELS
A.
Position the truck and aerial device
for use as outlined in the Owner’s Manual.
B.
If the platform has been transported to the job site on the truck, attach the
loadline hook to the platform and set the platform on the ground at a radius that
will allow the platform to be pinned onto the boom.
C.
Remove loadline from boom sheave case, remove anti-two-block-downhaul
weight from loadline and stow loadline on the block provided on top of the main
boom section.
D.
Attach anti-two-block override flag onto the anti-two-block switch.
E.
Follow instructions in the Platform Installation and Operation section of this
manual.
Operation
A.
When setting up at a job site, make sure all outriggers and stabilizers are
extended to level the truck and the ground can support the imposed loads.
B.
Attach the personnel platform as previously described.
C.
If using remote controls, turn the power switch on at the control console.
Operate all aerial device functions using the
remote control transmitter before performing
any lift operations with the personnel platform
occupied.
D.
Referring to the load chart, plan the platform
lift operation and review where the load chart
will allow the loaded personnel platform to travel.
E.
Have platform personnel put on the body harnesses with the attached safety
lanyard and attach the safety lanyards to the designated anchorage points.
Summary of Contents for Traffic Safety Service L60
Page 2: ...Updated March 10 2020...
Page 5: ......
Page 37: ...Platform Safety hireach EEC 0145 V1 1 Platform Safety...
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 140: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 152: ...Platform Level System EEC 0137 V1 0 Platform Leveling System...
Page 182: ...4 HYDRAULIC SCHEMATIC...
Page 194: ...16 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 212: ...Appendix B Parts Index ELLIOTT Built for You L60 Operator s Manual B 1...