![Elliott Traffic Safety Service L60 Operator'S Manual Download Page 108](http://html1.mh-extra.com/html/elliott/traffic-safety-service-l60/traffic-safety-service-l60_operators-manual_2393850108.webp)
Required Inspections-aerial1 EEC-0088
V1.4
Required Inspections
Operation of the Tool Circuit
The tool circuit consists of an on/off control, an adjustable flow control, and one
or more sets of pressure and return (tank) quick disconnects. If quick disconnects are
located in the platform, there will be a tool circuit control in the platform as well. Before
using the tool circuit, locate the adjustable flow control and determine the desired flow
rate for the tool to be used. The flow control is labeled 0 to 10 which represents 0 to 100
percent of the hydraulic system flow (normally 7 GPM at engine idle and 14 GPM at
high engine speed). For 5 GPM flow set the flow control at 7, and operate the engine at
idle speed for 70 percent of 7 GPM. Connect the open-center tool to the quick
disconnects before turning “on” the tool circuit.
NOTE: Running the tool circuit with no open-center tool connected will dead-head
full system pressure into the tool pressure line, and will pop the system relief and
generate excessive heat
.
Additional Information
If the unit is equipped differently than those covered in this section or the
operations manual, contact an authorized Elliott distributor in your area, or contact Elliott
Equipment Company for proper operating procedures.
Elliott Boom Disassembly and Inspection
Elliott Equipment Company recommends that Boom Truck, HiReach and Digger
Derrick booms be disassembled and inspected at seven-year intervals. However,
based on the duty cycle of the boom and the attention to proper service,
maintenance and inspection, this interval could be more or less than seven
years.
Summary of Contents for Traffic Safety Service L60
Page 2: ...Updated March 10 2020...
Page 5: ......
Page 37: ...Platform Safety hireach EEC 0145 V1 1 Platform Safety...
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 140: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 152: ...Platform Level System EEC 0137 V1 0 Platform Leveling System...
Page 182: ...4 HYDRAULIC SCHEMATIC...
Page 194: ...16 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 212: ...Appendix B Parts Index ELLIOTT Built for You L60 Operator s Manual B 1...