6
USER MANUAL
RPS/M/1K
Elettrotest S.p.A. P.zza R. Riello, 20/B - 45021 Badia Polesine ( RO ) - tel. +39 0425 53567 - Fax +39 0425 53568
e-mail:
http:
62000582 Rel.1.0 – 15/03/2018
1.9.
NOTES FOR THE INSTALLATION
1.9.1.
RPS/M/1K
Connect one supplying cable 2P+G (standard IEC cable) of suitable section (minimum
section 3x1.5 mm
2
).
Protect the input line with the circuit breakers presented in paragraph 5.
Connect load cable to the output connector. Use an appropriate sections according to the
maximum load tolerable by the RPS.
Put the ferrite core on the load cable close to RPS.
Optionally: Connect the sense wires.
Keep front area free for ventilation.
When RPS is mounted inside a cabinet you must install a forced ventilation in order to
expel the hot air.
Never lay power cables (including the electrical cables) and probe signal cables in the same
conduits;
Cleaning the device: When cleaning the device do not use ethyl alcohol, hydrocarbons
(petrol), water, detergents, ammonia and derivatives. Use only a dry cloth.
INPUT CONNECTOR
OUTPUT CONNECTOR
FERRITE CORE