INSTALLATION
03/2022
39
NP-DK50 2V 50, 2x2V 110-AD-A-1_03-2022
Fig. 14: Positioning of the compressor for connections
Make the pneumatic connections per Chapter 11.1.
Connect the condensate collection tank per Chapter 11.3.
Route the pressure hose, the condensate drain hose, and the power cord through the opening
in the rear wall of the cabinet.
Position the compressor at such a distance from the cabinet so the WINSTA connector can
make the electrical connection between the compressor and the cabinet (Fig. 13, Fig. 15).
Fig. 15: Positioning the compressor for electrical connections
Summary of Contents for DK50 2V/50/M
Page 1: ...N VOD NA POU ITIE SK USER MANUAL EN BENUTZERHANDBUCH DE...
Page 2: ......
Page 4: ...CONTENTS 5 INHALT 76 OBSAH 146...
Page 18: ...PRODUCT DESCRIPTION NP DK50 2V 50 2x2V 110 AD A 1_03 2022 18 03 2022 B DK50 2x2V 110S M...
Page 89: ...PRODUKTBESCHREIBUNG 03 2022 89 NP DK50 2V 50 2x2V 110 AD A 1_03 2022 B DK50 2x2V 110S M...
Page 158: ...POPIS V ROBKU NP DK50 2V 50 2x2V 110 AD A 1_03 2022 158 03 2022 Obr 4 Skrinka A DK50 2V 50S M...
Page 159: ...POPIS V ROBKU 03 2022 159 NP DK50 2V 50 2x2V 110 AD A 1_03 2022 B DK50 2x2V 110S M...
Page 218: ......
Page 219: ......
Page 220: ...NP DK50 2V 50 2x2V 110 AD A 1_03 2022 112000519 000...