8 Installation and connecting of the UPS
All requirements in the technical data regarding environmental and operating
conditions must be observed to ensure trouble-free functioning of the UPS.
The following must be observed when setting up / installing the UPS
equipment:
Avoid extremes of temperature and atmospheric humidity. A maximum
service life, particularly in relation to the batteries, is achieved at an
ambient temperature of 15-25°C.
Always ensure that sufficient space is available behind the UPS to make
the necessary connections and, as the UPS is heavy, use suitable guide
rails during installation. The load-bearing capacity of the support must be
sufficient.
Observe the specified installation location and only mount the equipment
using the screw-in positions.
Make sure that ventilation of the equipment is possible at all times. As this
UPS is ventilated in a crosswise and lengthwise direction, a minimum
clearance of at least 50mm between the UPS and the cabinet in which it is
installed must be maintained at the sides as well as at the front and back.
Ensure an appropriate flow channel.
Make sure the equipment is arranged correctly. When installed in parent
systems (e.g. machine, control cabinet), it must be ensured that the UPS
operates within the specified temperature range. A sufficient level of forced
ventilation must exist to remove excess heat that builds up in the space
where the UPS is installed.