TP-00347-01
25
Power Supply Installation
Installation Procedure
To install tape drives:
S
TEPS
1.
Locate the vacant library controller bay on the lower right side of the rear panel.
2.
If present, loosen the screws and remove the library controller bay cover.
3.
Before installing the library controller, inspect its connectors. Ensure that the connectors are
intact, free of any foreign objects, and have no cracks or deformed or bent contacts.
4.
Insert the library controller on the alignment rails and push it into the bay until it seats itself
against the back of the library.
5.
Tighten the blue captive screws with your fingers to secure the library controller.
Power Supply Installation
The power supply is installed from the rear of the library. If the library does not have a power supply
installed, install it in the left power supply bay now.
Tools Required
The following tool is required:
•
No 2 Phillips screwdriver
Summary of Contents for 24Q
Page 1: ...24Q Ark Tape Library 48Q Ark Tape Library Setup and User s Guide ...
Page 37: ...TP 00347 01 37 Operator Control Panel OCP Main Menu Main Menu ...
Page 38: ...38 TP 00347 01 Chapter 4 Operation Information Menu Information Menu 1 of 2 ...
Page 39: ...TP 00347 01 39 Operator Control Panel OCP Information Menu 2 of 2 ...
Page 40: ...40 TP 00347 01 Chapter 4 Operation Commands Menu Commands Menu ...
Page 41: ...TP 00347 01 41 Operator Control Panel OCP Configuration Menu Configuration Menu ...
Page 42: ...42 TP 00347 01 Chapter 4 Operation Service Menu Service Menu 1 of 2 ...
Page 43: ...TP 00347 01 43 Operator Control Panel OCP Service Menu 2 of 2 ...
Page 70: ...70 TP 00347 01 Chapter 4 Operation ...
Page 106: ...106 TP 00347 01 Chapter 7 Specifications ...
Page 110: ...110 TP 00347 01 Chapter 8 Regulatory Information ...
Page 111: ......
Page 112: ...TP 00347 01 ...