- 41
-
ENGLISH
LEGEND
AF:
Cold Water
AL:
Water supply
C:
Filling/Topping up
GR:
Filling unit
MI:
Outlet to system
P:
Pump (circulator)
RA:
Radiators
RI:
Inlet from system
S:
Drain
ST:
Temperature Detector
TC:
Boiler-stove
V:
Ball valve
VA:
Automatic bleed valve
Vec:
Closed Expansion Tank
VSP:
Safety Pressure Valve
VST:
High Temperature
Drainage Valve
COVERING INSTALLATION
fig. 1
A
B
Fig. 1
The stove is delivered (Fig. 1) with the metal sides (A-B) and
the metal brackets (C-D) for fastening the horizontal ceramic
elements already mounted.
The pieces indicated below are packaged separately.
• 1 upper horizontal ceramic element (F - Fig. 3)
• 1 lower horizontal ceramic element (G - Fig. 7)
• 12 milled pins M4
• 24 washers
To fit proceed as follows:
Fig. 2
Open the pellet cover and loosen the screw (X) inside.
Fig. 3
Remove the top (E) complete with the pellet loading cover and
the air grill.
Slide off the two metal sides (M) by loosening the two milled
screws (V) on the rear of the stove.
C
D
fig. 3
E
M
M
M
V
M
X
fig. 2