7
Electric/Hydraulic TT Thruster 140 - 300
GB
Fig. 1.4.1
1.4 Installing hub unit and saddle
models 140T T & 185T T
NOTE: Illustrations based on 140TT saddle.
• To suit the wiring confi guration supplied fi t the thruster
propeller on the port side.
• Place gasket on hub and locate through centre hole. Sealant
can be applied to gasket and fl ange to aid sealing.
NOTE: To achieve the correct position of the
propeller in the tunnel the gasket must be inplace.
Fig. 1.6.2
• Apply zinc chromate paste or marine grease to location bore
and assemble saddle onto hub (SikaFlex® or similar maybe
used to seal saddle in place). Apply Blue Loctite® 243 to bolts
and hand tighten along with supplied washers (Fig. 1.4.2).
NOTE: Tighten to full torque within 10 minutes.
Fig. 1.4.2
1.6 Propeller assembly - all models
• Check the hub gasket is in place.
• Fig 1.6.1 - Assemble anode kit and propeller in this order:-
large washer, propeller, anode, small washer and nyloc nut
onto propeller shaft.
Fig. 1.6.1
NOTE: Poor exterior tunnel surface could
cause leakage and noise. Apply sealant to
this area as required (Fig. 1.4.2).
Fig. 1.6.3
DO NOT allow propeller to touch tunnel.
Check the propeller has been assembled in the correct order.
1.5 Gearbox position - 185T T only
• On installation check the position of the gearbox (leg) brass
stem in the saddle.
Fig. 1.5.1
Fig. 1.5.2
• If it is above 3.5 mm (
1
/
8
”), the tunnel should be packed under
the saddle (Fig 1.5.2).
• If it is below 2 mm (
1
/
16
”), material must be removed from the
tunnel (Fig 1.5.1).
NOTE: Tighten each bolt alternately a
number of times to full torque.
• Fig 1.6.2 - Tighten hub/saddle bolts to 9 Nm (6.6 lbs.ft) for 140
or 21 Nm (15.5 lbs.ft) for 185. Check that propeller is centred
and free turning (within 10 minutes of applying Blue Loctite®
243).
T1873 Lewmar USA4 T
2
2
:
3
0
:
5
7
Summary of Contents for 388CC
Page 1: ...388CC 388 Center Console OWNER ASSISTANCE MANUAL Revised 2014 ...
Page 30: ...29 Appendix 388CC ...
Page 31: ...30 ...
Page 32: ...31 Hydraulic Steering System ...
Page 33: ...32 ...
Page 34: ...33 ...
Page 35: ...34 ...
Page 39: ......
Page 105: ......
Page 122: ......
Page 157: ...8 Rotation of Ports 1 2 3 4 5 6 7 1 Rotation of Pump Head 2 3 4 5 ...
Page 160: ...GB ar com GB ...
Page 210: ...38 A B 50 mm C 20 mm ...
Page 243: ...24 SEASTAR Hydraulics ...
Page 245: ...26 SEASTAR Hydraulics ...
Page 247: ...28 SEASTAR Hydraulics ...
Page 249: ...30 SEASTAR Hydraulics ...
Page 258: ...vi Selection Guide ...
Page 264: ...1 6 Selection Guide ...
Page 268: ...2 4 Selection Guide ...
Page 294: ...4 8 Selection Guide ...
Page 344: ...11 2 Selection Guide ...
Page 360: ...T1873 Lewmar USA4 Thruster 140 to ...