Manual
6
System start-up
6-1)
Plug the furnace into an exclusive and of good quality socket which should be
correctly grounded to a copper rod and never to the electrical network neutral.
Check if the network voltage is the same as the one in the equipment, which is
shown on the power cable label or printed at the furnace backside. Pic-1 item (01).
6-2)
Turn the main switch on Pic-3 item (21) and wait for the equipment to start-up.
Four screens will be visualized in a sequence showing the complete equipment
6-3)
SCREEN-1 -> The message (EDG) can be visualize
don the first screen as the system checks its functions and
performs the first configurations.
INICIALIZAÇÕES
LIBERA VÁCUO
TEMP-AMBIENTE
VERSÃO-PROGRAMA
6-4)
SCREEN-2 -> On the second screen, the current
program version can be seen for product manufacturing
6-5)
SCREEN-3 -> The message (Ar) can be seen on the
third screen and the program waits for 30 seconds for the
air to return to the muffle.
6-6)
SCREEN-4 -> On the fourth screen, after the
checking-up is done, the system loads the sintering
standard no. 40 recipe (padrão de sinterização n. 40) and
will keep waiting for the next instruction by the operator. We
remind you that for sintering, the furnace will only heat up
after the (start) command is activated by the operator, therefore the temperature
shown on the display will be close to the ambience temperature.
6-7)
The furnace must not start the heating process without the burn platform
molded in ceramic fiber put on the base, PIC-4 item (23) otherwise the seal ring and
the base will be seriously damaged. Use adequate accessories according to the
wanted procedures PIC-5.