37
9-4 Combustion Analyzer Port
Combustion Analyzer Port
9-5 Burner Flame
Flame
Flame
Burner
9 - START UP PROCEDURE
NOTICE
Combustion analyzer port is provided. After use
replace cover.
Look for BLUE flame
with slight YELLOW tips
evenly spaced around
burner
9�6 Perform CSD-1 Compliance Test (see
paragraph 2�5 page 6)
Verify operation of boiler safety control operation with
regard to no flow conditions as follows:
1.
Turn off boiler using boiler service switch.
2.
Disable primary boiler pump. Disconnect multi pin
connector J7 from control module. See figure 9-6.
3.
Disable secondary system pumps attached to
system.
4.
Establish call for heat. Jump CHW T-T terminals
on low voltage terminal block. Turn on boiler using
boiler service switch.
5.
Boiler will fire. Based on natural convection within
boiler, boiler will either:
A. Lockout A-06 "Safety Relay Error". Requires
manual reset of control module. Press reset
button on User interface. See
9.3 Program Boiler
Control
.
OR
B. Shut off burner E40 "Return Water Temp". This
is a soft lockout. When water temperature drops
below limit boiler will automatically refire then
Lockout A-06 requiring manual reset of control
module. Press Reset button on User Interface.
OR
C. Shut off burner E39 "Flue Temperature Sensor".
This is a soft lockout. When flue sensor drops
below limit, boiler will automatically refire then
Lockout A-06 requiring manual reset of control
module. Press Reset button on User Interface.
6.
After safety operation is verified, turn off boiler via
service switch. Remove jumper in T-T. Replace J7
connector into control module, enable secondary
pump operation, turn service switch on and restart
system to verify operation.
Summary of Contents for 075 97gb
Page 44: ...44 13 TROUBLE SHOOTING ...
Page 48: ...48 13 TROUBLE SHOOTING ...
Page 50: ...50 13 TROUBLE SHOOTING ...
Page 61: ...61 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Page 62: ...62 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Page 78: ...78 NOTES ...
Page 79: ...79 Company Address Phone Company Name Tech Initials Service Performed Date ...