71
User Interface Display
Explanation
Installer Menu
Bo
iler Status
Control module logs successful and failed ignition attempts.
Information accessed in ‘Ignition Attempts’ Screen as shown.
Ignition attempts are stored in non-volatile memory and are
retained in event of power failure.
Figure A-1 Typical Ignition Cycle
Following control features are implemented to ensure safe and
reliable operation of Combustion System:
False Flame
Detection
If flame is detected at end of pre-spark
period (Ignit_0) than lockout will occur.
Re-ignition
If at end of safety period no flame
detected control will go to post-purge
removing unburned gas. Re-ignition
attempt started following same cycle.
Number of re-ignition attempts limited
to 3 after which lockout occurs.
Intermittent
Operation
Boiler can be firing continuously for 24
hours. Burner switched off and restart
sequence follows.
Flame out too
late
If flame detected after post purge lockout
follows.
Safety relay test
In Safety ON/OFF state correct operation
of safety relay is proved before ignition.
UL3563
High Limit
Temperature
Device
Boiler comes equipped with UL353
approved temperature high limit device.
Gas Valve de-energized when supply
temperature exceeds 203°F lockout
follows.
APPENDIX A - CONTROL MODULE
Summary of Contents for 075 97gb
Page 44: ...44 13 TROUBLE SHOOTING ...
Page 48: ...48 13 TROUBLE SHOOTING ...
Page 50: ...50 13 TROUBLE SHOOTING ...
Page 61: ...61 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Page 62: ...62 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Page 78: ...78 NOTES ...
Page 79: ...79 Company Address Phone Company Name Tech Initials Service Performed Date ...