19
FIGURE 5-3 - PIPING DIAGRAM - LWCO LOCATION
5 - HYDRONIC PIPING
Air Vent
Supply
Gas
Boiler
Safety Relief
Valve
Position LWCO Above
Top of Boiler
DO NOT PLACE ISOLATION VALVE
BEFORE TEE OR LWCO.
Note
*To Drain
* Check Local Codes for
Maximum Distance to
Floor.
Arrange piping to prevent
water dripping onto boiler.
Return
Low Water Cutoff (LWCO)
Installation if required by the
Authority Having Jurisdiction
(See Figure 5-5 for detail)
Magnetic
Dirt
Separator
Purge Valve
PN 240012363 REV. A [08/31/2018]
Note
Illustrations are meant to
show system piping concept
only. Installer is responsible
for all equipment and detailing
required by authority having
jurisdiction.
Note
Required
Closely Spaced
Tee's Per
Figure 5-6