Top connected system tank, CS300
12
ECOScience ENERGY CENTRE
INSTALLATION AND USER MANUAL
E
d
ition:
01;
La
st
upda
te
d: 201
1-
04-1
2
© ECOScience
4.4
CONNECTING THE PIPES
4.4.1
Please note
•
All existing or new systems must be flushed clean before any pipe
fittings are connected permanently.
•
The system tank must be connected to a closed expansion vessel.
A manometer that indicates the system pressure must be mounted
in the connection to the expansion vessel (see ‘ APPENDIX 2 -
FLOW CHART’). (The manometer and expansion vessel are
provided by the installation engineer.)
•
The system pressure must not fall below 0.9 bar.
•
ECOScience recommends stainless steel or PEX pipes. If these are
not available, copper pipes should be used.
•
All connection fittings to the system are ¾”.
4.4.2
Instructions
1.
Connect pipes as shown in the pipe connection diagrams.
2.
Fit an existing or new circulation pump to the radiator circuit supply
pipe (see ‘ APPENDIX 2 - FLOW CHART’ and see ‘ APPENDIX 3 -
WIRING DIAGRAM AND TEMPERATURE SENSORS’).
3.
Connect a hose between the safety valve and floor drain (”4.4.3
Pipe connections” No. 7).
CAUTION! CUTTING PIPES!
In order to avoid any metal filings that may clog filters
and connections and lead to corrosion in the system,
pipes must only be cut with pipe cutters. Circular
cutting saws or hacksaws must not be used.
Summary of Contents for 6300wt
Page 2: ......
Page 6: ......
Page 14: ......
Page 70: ......
Page 71: ...Flow chart for heating and hot tap water ...
Page 72: ......
Page 73: ...Wiring Diagram ...
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ...List of Components ...
Page 84: ......