vi
ECOScience ENERGY CENTRE
INSTALLATION AND USER MANUAL
E
d
ition:
01;
La
st
upda
te
d: 201
1-
04-1
2
© ECOScience
RESPONSIBILITY
The installation engineer is responsible for ensuring that these
instructions are followed and that the environment and the methods
used when the control system is installed, commissioned and operated,
are correct. If these instructions are ignored, costly material damage
and/or serious personal injury may result.
Due to the foregoing, neither the manufacturer nor the supplier of this
product shall be liable for losses, damage or other costs incurred as a
result of incorrect installation and/or commissioning, operation or
maintenance work.
The manufacturer and/or the supplier of this product reserves the right to
amend and/or update, without notice, the composition of the product, its
specifications, technical information and/or the accompanying
installation and operation manual.
If the control system becomes damaged, or deficiencies are discovered
that may put safety and/or operation at risk, the system must be
switched off immediately and the installation engineer called in.
Summary of Contents for 6300wt
Page 2: ......
Page 6: ......
Page 14: ......
Page 70: ......
Page 71: ...Flow chart for heating and hot tap water ...
Page 72: ......
Page 73: ...Wiring Diagram ...
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ...List of Components ...
Page 84: ......