Top connected system tank, CS300
2. Check that the shut-off valves are open (”4.7.3 Connections and
shut-off valves” (No. 1 and 3))
.
3.
Make sure that the valve for bleeding air out of the system is open.
4.
Connect the tap water via the tap water connection (No. 4) and fill
with water until water comes out of the bleeding valve.
5.
Close the bleeding valve and continue to fill with water until the
desired system pressure is reached (min: 0.9 bar, max: 1.3 bar).
6.
Check there are no leaks.
7.
Close the shut-off valves (Nos. 1 and 3).
8.
Remove hose (No. 2).
The system is now ready for commissioning (see ‘5 COMMISSIONING’)
PLEASE NOTE: SYSTEM PRESSURE!
The system pressure must never fall below 0.9 bar.
PLEASE NOTE: EQUIPMENT!
ECOScience recommends the use of vacuum
bleeding and top-up equipment (Flamco ENA or
equivalent for example) when the product and
system are being filled.
This will ensure that the system water is correct,
creating the right conditions for optimum energy
exchange.
If bleeding and top-up equipment is not used,
ECOScience shall not be liable under warranty.
Summary of Contents for 6300wt
Page 2: ......
Page 6: ......
Page 14: ......
Page 70: ......
Page 71: ...Flow chart for heating and hot tap water ...
Page 72: ......
Page 73: ...Wiring Diagram ...
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ...List of Components ...
Page 84: ......