COMMISSIONING
Before operation, make sure you have read and understood section ”2
SAFETY INSTRUCTIONS” onwards.
5.1
PREPARATIONS BEFORE STARTING
Check that:
•
The product is earthed.
•
All parts are installed correctly and flushed clean.
•
There are no leaks in the system.
•
All sensors are mounted and connected properly. The installation
engineer is responsible for ensuring that all sensors included with
delivery are installed in accordance with the flow chart. Outdoor
sensors must be positioned to be north-facing wherever possible.
Indoor sensors must be positioned 1.60 m above the floor, in the
centre of the house wherever possible and must not be exposed to
direct sunlight or located near a heat source.
5.2
START-UP
1.
Turn on the main switch so that the display window lights up.
2.
If necessary: Adjust the settings in the control system to optimise
the system.
3.
Activate the heat-up sequence (see ‘6.3.3 Heat-up sequence’).
5.3
NORMAL STOP
1.
Ensure no current is running through the system by turning the main
switch to OFF.
RESPONSIBILITIES OF THE
INSTALLATION ENGINEER!
The installation engineer is responsible for walking
through the system with the end user.
Summary of Contents for 6300wt
Page 2: ......
Page 6: ......
Page 14: ......
Page 70: ......
Page 71: ...Flow chart for heating and hot tap water ...
Page 72: ......
Page 73: ...Wiring Diagram ...
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ...List of Components ...
Page 84: ......