28
4. Fix the waterproof cover and lock it.
Note:
Declaration for back-up function:
Some external factors may cause the back-up switching time more than 10 ms, so do not
connect loads that depend on a stable energy supply for a reliable operation.
Loads which may create very high start-up current surges such as fixed frequency air
conditioner, high-power pump, these loads may cause the inverter into overload
protection state.
Step 6 :
Connect PE cable.
Step 7:
Connect PV cables
1. Press the terminal;