25
Step 3:
Connect the cables between two battery boxes
Find two wires from the inverter box and insert the corresponding port according
to the wire number.
Step 4:
Connect the communication cables
Open the communication cover plate and wiring according to the print instructions on
the communication cover board. Open the press nut of the waterproof connector,
pull out the seal race, then penetrate the conductor into the hole, connect the
corresponding label in turn, then tighten the forced nut, and finally lock the
waterproof cover plate.
Summary of Contents for WH-SPHA3.6H-5.12kWh
Page 10: ...10 Terminals of BESS...
Page 14: ...14 500 1 500 mm beside the BESS 2 800 mm above the BESS 3 500 mm before the BESS...
Page 35: ...35...
Page 48: ...48 Group curves This page shows the 28 different data curves of the device...
Page 49: ...49 Configuration Battery setting...
Page 59: ...59 9 2 Battery label...
Page 60: ...60...