EBONITE MILL DRILL OPERATIONS MANUAL
Congratulations on your purchase of the Ebonite Mill Drill Machine. While all of us
at Ebonite thank you for your purchase we are also confident that you will find this
to be a great addition to your pro shop business.
Mill Drill Set-Up
Section (1) Receiving New Machine
The Mill Drill machine was packaged complete in the factory and shipped to you in this
manor for your convenience. Before removing the top and 4 sides of the crate be sure to note
if there was any
damage
from shipping to the
crate
. This is
important
as the
freight
company
should be
notified immediately
.
The Mill Drill Crate is 4’ x 4’ x 6 ½’ and generally will not fit through the entry doors of
the bowling center. Therefore remove the 4 sides and the top to the crate by removing all the
Phillips head screws and discard them, before attempting to move the machine in the bowling
center. Next remove the accessories, drill bits etc. from the stand and the bottom of the crate.
All of these items are placed in the storage area of the stand to keep them from moving
during shipping.
WARNING:
The Mill Drill is very TOP HEAVY.
Use EXTREME CAUTION when moving the machine.
Section (2) Locating New Machine
1.
Remove the ½” lag bolts that hold the machine stand to the bottom of the wooden
crate, being careful not to tip the machine in anyway.
2.
Using and appliance dolly place it under that back of the machine the motor side, (
this
step is best when there are at least 3 people, one to hold the dolly and guide the
machine and one on each side of the machine to support and help guide the machine
while moving
). When everyone is in place tip the machine back on the dolly and roll off
REV A 12-2-05 3