8 Installation
Gateways must only be installed and wired up by qualified electricians or
other persons familiar with electrical engineering. The field bus address will
be automatically assigned and cannot be set on the device. The data transfer
rate is full-duplex 100 Mbit/s.
The gateway is installed in the following order:
•
Join the gateway and all I/O slice modules to form a system block.
•
Mount the system block on the DIN-rail.
•
Connect the power supply.
•
Connect the field bus.
DANGER OF ELECTRIC SHOCK!
All installation work must be carried out with the entire installa-
tion in a de-energized state.
Always follow the safety rules:
• De-energize and isolate the system.
• Verify isolation from the supply.
• Secure against restart.
• Short-circuit and ground.