Xiria
994.570 G01 06
21
Procedure (Xiria E with top-unit)
1.
Open top-unit with key.
2.
The secondary compartment is now accessible, see
Figure 3-15.
Procedure (Xiria Metering panel)
1.
Open integrated low voltage compartment, see
Figure 3-16.
2.
The secondary compartment is now accessible.
Figure 3-15
Figure 3-16
Summary of Contents for Xiria
Page 39: ...Xiria 994 570 G01 06 39 APPENDIX 1 FLOOR PLANS ...
Page 40: ...Xiria 40 994 570 G01 06 ...
Page 41: ...Xiria 994 570 G01 06 41 ...
Page 42: ...Xiria 42 994 570 G01 06 ...
Page 43: ...Xiria 994 570 G01 06 43 ...
Page 44: ...Xiria 44 994 570 G01 06 ...
Page 45: ...Xiria 994 570 G01 06 45 APPENDIX 2 VOLTAGE DETECTING SYSTEM WEGA ...
Page 46: ...Xiria 46 994 570 G01 06 ...
Page 47: ...Xiria 994 570 G01 06 47 ...
Page 48: ...Xiria 48 994 570 G01 06 APPENDIX 3 ORION 3 0 ...
Page 49: ...Xiria 994 570 G01 06 49 APPENDIX 4 SHORT CIRCUIT INDICATOR ...
Page 55: ...Xiria 994 570 G01 06 55 ...
Page 56: ...Xiria 56 994 570 G01 06 ...