Lifting
W
ARNING
The person in charge of lifting the Xiria unit must
hold a certificate issued by the relevant authorities
to certify that he/she is authorised to carry out
these operations.
After installation the lifting equipment (1) must not be
removed.
3.2.2
Travelling
The unit is supplied packaged on a wooden pallet. This
means that it can be moved simply and safely on a pallet
truck. Leave the unit on the pallet as long as possible and
carry it on the pallet right up to the assembly location.
Figure 3-1: Fitting the lifting equipment
Figure 3-2: Single panel
Figure 3-3: Metering panel
1
Summary of Contents for Xiria
Page 39: ...Xiria 994 570 G01 06 39 APPENDIX 1 FLOOR PLANS ...
Page 40: ...Xiria 40 994 570 G01 06 ...
Page 41: ...Xiria 994 570 G01 06 41 ...
Page 42: ...Xiria 42 994 570 G01 06 ...
Page 43: ...Xiria 994 570 G01 06 43 ...
Page 44: ...Xiria 44 994 570 G01 06 ...
Page 45: ...Xiria 994 570 G01 06 45 APPENDIX 2 VOLTAGE DETECTING SYSTEM WEGA ...
Page 46: ...Xiria 46 994 570 G01 06 ...
Page 47: ...Xiria 994 570 G01 06 47 ...
Page 48: ...Xiria 48 994 570 G01 06 APPENDIX 3 ORION 3 0 ...
Page 49: ...Xiria 994 570 G01 06 49 APPENDIX 4 SHORT CIRCUIT INDICATOR ...
Page 55: ...Xiria 994 570 G01 06 55 ...
Page 56: ...Xiria 56 994 570 G01 06 ...