6. Operation and Configuration of S3M UPS Models
and Battery Cabinets
Step 3: Setting Single Battery (Ah) Capability
Change the Single Battery (Ah) Capability to the individual Ah capacity for one individual battery as follows for the specific
battery cabinet models:
• BP240V09/BP240V09K: the Single Battery (Ah) Capacity is 9
• BP240V40/BP240V40L: the Single Battery (Ah) Capacity is 40
• BP240V65/BP240V65L: the Single Battery (Ah) Capacity is 65
• BP240V100/BP240100L: the Single Battery (Ah) Capacity is 100
The values can be 7~2000.
Scroll to the next display screen by pressing the down arrow.
Step 4: Setting Max Charge Current
Max Charge Current is the estimated charge current that the UPS will use to charge the batteries. Obtain the
recommended estimated Max Charge Current based on the specific S3M UPS and battery cabinet model combination
from the chart in
Section 6.4
.
Float and Boost Voltage:
The UPS is factory-set for proper float (2.27V/cell, 13.62V/battery) and boost (2.35V/cell,
14.1V/battery) voltages.
Cell float voltage:
The float voltage value can be 2.23~2.30 V/cell. The default value is 2.27 V/cell.
Cell boost voltage:
The battery equalized voltage value can be 2.30~2.40 V/cell. The default value is 2.35 V/cell.
Summary of Contents for Smart Online S3M BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Frente Capa 3 Capa 2 Capa 1 Atrás ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Avant Couche 3 Couche 2 Couche 1 Arrière ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...