27
5. Installation
Figure 5-10A Figure 5-10B
13. Reinstall the right side and left side bracket bars of group 3 batteries (Figures 5-11A and 5-11B).
11. Install 10 battery packs in the next layer (L3-A, group 3 positive string). Be sure to keep terminal sides of all batteries
up (Figure 5-10A).
12. Install another 10 battery packs to the layer (L3-B, group 3 negative string). Be sure to keep terminal sides of all
batteries up (Figure 5-10B).
Figure 5-11A Figure 5-11B
Summary of Contents for Smart Online S3M BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Frente Capa 3 Capa 2 Capa 1 Atrás ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Avant Couche 3 Couche 2 Couche 1 Arrière ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...