SM65 Supervisory Module Handbook
14
Copyright © 2004-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-35E December 2009
Activating the Relay Test Function and Toggling the Relay States
The Relay Test function can be used to test the relay configuration and wiring to a remote
location.
►
To activate the Relay Test function and toggle the relay states using
DCTools
1
Ensure that the SM65 is powered and connected to
DCTools
(refer to the
Communications Options on page
2
From the
DCTools
System Summary (Home) screen, click the Relays hotlink at the top of
the screen. The
Relay Table
screen is then displayed.
3
Set the Relay Test Duration as required.
4
To change the state of a relay, double-click on the Test State for that relay, then click
D
and select the new test state from the popup list.
5
Click on the
Apply Changes
button. The selected relay state will be toggled for 10 seconds
(the default
Relay Test Duration
which is configurable in
DCTools
), before returning to its
original configured state.
►
To activate the Relay Test function and toggle the relay states using the keypad
1
From the Main Display Mode, press
8
to enter Configuration Mode.
2
Press
6
to scroll down to Relay Test.
3
Press
8
to enter Relay Test Mode.
4
Press either
7
or
6
to select a relay.
5
Press
8
to toggle the state (active or inactive) of the selected relay (relay must be
Enabled
). The selected relay state will be toggled for 10 seconds (the default Relay Test
Duration, which is configurable in
DCTools
), before returning to its original configured
state.
If the state of a relay has been set to disabled, its state cannot be toggled.
6
Press
9
to return to Configuration Mode. (All relays return to their configured states.)
The display time-out interval in Relay Test mode is 2 minutes.