
MBM INSTALLATION
Eaton 9395 Maintenance Bypass Module Installation and Operation Manual
S
164201719 Rev 3
www.eaton.com/powerquality
4-7
Top View Front Bracket
Top View Rear Bracket
UPS Top
MBM Top
UPS Top
Screw from Kit
Screw from Kit
Screw from Kit
Screw from Kit
Bracket from Kit
MBM Top
Bracket from Kit
Back
Front
Front View Base Bracket
UPS Base
MBM Base
Bracket from Kit
Screw from Kit
Screw from Kit
Figure 4‐7. MBM to Eaton 9395 UPS Joining Brackets
4.3.2
Line-up-and-Match Power Wiring Installation
NOTE
The MBM cabinet is shipped with a debris shield covering the ventilation grill on top of the unit. Do
not remove the debris shield until installation is complete. However, remove the shield before using the
MBM. Once the debris shield is removed, do not place objects on the ventilation grill.
NOTE
Power wiring to the MBM maintenance bypass input and the output to the critical load must be run
in customer-supplied conduit.
NOTE
Remove the MBM cabinet top or bottom conduit landing plate to drill or punch conduit holes (see
NOTE
Refer to the applicable Eaton 9395 Installation and Operation manual listed in paragraph 1.7 on
page 1-4 for UPS cabinet wiring information, and conduit and terminal locations.
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. Refer to
the applicable Eaton 9395 Installation and Operation manual listed in paragraph
1.7 on page 1-4 for shutdown instructions.
2.
If not already open, unfasten the front door latch and swing the doors open (see
Figure 4‐1 on page 4-2).