
MBM INSTALLATION
Eaton 9395 Maintenance Bypass Module Installation and Operation Manual
S
164201719 Rev 3
www.eaton.com/powerquality
4-10
Top Entry Conduit Landing for AC
Input, AC Output, and Interface
Connections
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Ventilation Grill Debris Shield
(Remove shield before operating
system.)
Bottom Entry Conduit Landing for AC
Input, AC Output, and Interface
Connections
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
Figure 4‐8. Conduit and Wire Entry Locations