Table of contents
4
Power Xpert
®
UX with W-VACi
circuit breaker 6063308 G01 01 14 July 2011 www.eaton.com
3.2.2
Instructions for transport
27
3.2.3
Transport in the operating area
28
3.3
System assembly
28
3.3.1
Foundation on site
28
3.3.2
Unpacking the delivery
28
3.3.3
Inspection of the floor
28
3.3.4
Preparations
29
3.3.5
Installation of the switchgear
32
3.4
Busbar coupling
33
3.4.1
Main busbar
33
3.4.2
Earthing busbars
34
3.5
Connection of wiring and cables
35
3.5.1
Connecting a main cable
36
3.5.2
Connection of secondary wiring
36
3.5.3
Connecting the auxiliary cables
37
3.5.4
Inter-panel connection of auxiliary cables
37
4
System operation
38
4.1
Operation - General
38
4.1.1
Mechanical operation door open
39
4.1.2
Charging the closing spring
39
4.1.3
Mechanical operation door closed
40
4.1.4
Electrical operation
40
4.2
Unit insertion and withdrawal
41
4.2.1
Standard interlocking
41
4.2.2
Inserting a unit
42
4.2.3
Door interlock mechanism
43
4.2.4
Withdrawing a unit
43
4.2.5
Locking the shutters
44
4.3
Earthing
45
4.3.1
Cable door interlock mechanism
45
4.3.3
Switching on/off the earthing switch
46
4.3.4
Earthing busbar/cable using withdrawable earthing unit
46
4.4
Checks
47
4.4.1
Shutter lifter truck
47
4.4.2
Optional Voltage Detection System VDS
49
5
System commisioning and decommisioning
50
5.1
Commissioning
50
5.1.1
Acceptance testing
50
5.1.2
Inspections
50
5.1.3
Handover
50
5.2
Decommissioning
50
5.2.1
Dismantling
50
5.2.2
Disposal
50
6
System inspection, maintenance and repair
52
6.1
Logbook
52
6.2
Inspection and maintenance, general
52
6.2.1
Periodic check
52
6.2.2
Maintenance
52
6.3
Fault diagnosis
53
6.3.1
What to do in the event of a fault
53
6.3.2
Troubleshooting table
53