4.9.6 CT Ratio
Position the selection arrow next to
CT Ratio
and press
Enter.
This screen, shown in figure 4.13, indicates
the current transformer ratio selected as the
ratio of the current transformers being used
with the IQ 200. If the ratio displayed is
not
correct, proceed to
section 4.10 Edit
Setpoints.
Figure 4.13 CT Ratio
4.9.7 PT Ratio
Position the selection arrow next to
PT Ratio
and press
Enter.
This screen, shown in figure 4.14, indicates
the potential transformer ratio selected as
the ratio of the potential transformers being
used with the IQ 200. If the ratio displayed is
not
correct, proceed to
section 4.10 Edit
Setpoints.
Figure 4.14 PT Ratio
4.9.8 Demand Window
Position the selection arrow next to
Demand Window
and press
Enter.
This screen, shown in figure 4.15, indicates
the time window over which demand
parameters are measured. If the time
displayed is
not
correct, proceed to
section
4.10 Edit Setpoints.
Figure 4.15 Demand Window
4.9.9 KYZ Setup
Position the selection arrow next to
KYZ Setup
and press
Enter.
This screen, shown in figure 4.16, indicates
the system value which the IQ 200 will
monitor, or
Track
. It also indicates the
energy
per pulse
Rate
over which energy
demand (consumption) is measured. If the
values displayed are
not
correct, proceed to
section 4.10 Edit Setpoints.
Figure 4.16 KYZ Setup
4.9.10 Exit
Pressing Enter when this menu item is selected returns the display to the main
menu.