SECTION 3: INSTALLATION
3.1 INTRODUCTION
The IQ 200 is designed to be installed, operated, and maintained by adequately
trained personnel. These instructions do not cover all details, variations or
combinations of the equipment, its storage, delivery, installation, checkout, safe
operation, or maintenance. Care must be exercised to comply with local, state, and
national regulations, as well as with industry standard safety practices for this class
of equipment. Refer to figure 3.5 through 3.14 for wiring details.
WARNING
A THREE PHASE SWITCH OR CIRCUIT BREAKER SHOULD BE IN CLOSE
PROXIMITY TO THE IQ 200 MOUNTING LOCATION AND MARKED AS THE
DISCONNECTING DEVICE FOR THE EQUIPMENT.
WARNING
TURN OFF AND LOCK OUT POWER SUPPLYING THE PANELBOARD OR
SWITCHGEAR IN WHICH THE IQ 200 IS BEING INSTALLED. INJURY TO
PERSONNEL OR DAMAGE TO EQUIPMENT CAN RESULT.
3.2 PANEL PREPARATION
It is recommended that the IQ 200 be mounted in an electrical switchgear enclosure
that is suitable for its environment. The IQ 200 Display and IQ 200 Base Modules
may be mounted together or separately. The IQ 200 is designed with flexibility in
mind. While it is recommended that the IQ 200 Display Module be door- or panel-
mounted, the Base Module may be attached to the IQ 200 Display Module; mounted
remotely using the supplied DIN rail and clip, or L-bracket; or mounted directly to
panel or floor. For floor or panel mounting, a #10 (10-32) or #12 (12-28) screw is
recommended.
In
all
instances where the IQ 200 Base Module is mounted remotely, the IQ 200
Display Module Chassis
must
be connected to earth ground.
Before installing the IQ 200, refer to dimensions listed in table 2.5 and allow
adequate room for wiring of and access to the IQ 200 Base Module terminals and
connectors.