DESCRIPTION:
DATE:
DRAWING NO:
3 of 3
SHEET:
REVISION:
B
091504
BATTERY CABINET SCHEMATICS
BATTERY BREAKER CB1 CONTROL
FIRST AND MIDDLE CABINETS IN MULTI-CABINET INSTALLATIONS
SINGLE CABINET INSTALLATIONS AND LAST CABINET IN MULTI-CABINET INSTALLATIONS
(Not used)
Installation Information
A-7
EATON
Powerware
®
9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual
S
164201536 Rev D
www.eaton.com/powerquality