2.3.1
Environment Considerations
The life of the battery system is adversely affected if the installation does not meet the
following guidelines:
A
The system must be installed on a level floor suitable for computer or electronic
equipment.
A
The system must be installed in a temperature and humidity controlled indoor area free
of conductive contaminants.
A
The Environmental Monitoring Probe (EMP), for remote monitoring of battery
environmental conditions, must be installed and set up by an authorized Powerware
Customer Service Engineer, or the extended battery warranty terms specified on
page W-1 will be void.
Failure to follow guidelines may void your warranty.
2.3.2
Preparing for Wiring the Battery System
Power and control wiring for integral (line-up‐and‐match) battery cabinets are supplied
with the cabinets.
Wiring requirements for battery cabinets installed separate from the UPS cabinet, including
the minimum AWG size of external wiring, can be found on Drawing 164201536-5, Table D,
starting on page A-10. The power wiring connections for this equipment are rated at 90° C.
If wire is run in an ambient temperature greater than 30° C, higher temperature wire
and/or larger size wire may be necessary. Battery control wiring requirements can be found
on Drawing 164201536-8, starting on page A-17 and should be connected at the battery